Disagreements, Decision Making and the Evaporating Cloud

Is it too much to ask that decision makers make use of a collaborative goal and values-based conflict resolution approach to come to effective resolutions that satisfy needs?

Whether decisions are made in socio-political, organizational, and personal realms we all know that they are important. They direct action, resolve and cause disagreements. Decisions, if carried out, have physical, financial, emotional and relationship impacts.

 

Decisions are most likely to be “good” ones when disagreements or conflicts are well managed. The best decisions are made with clear objectivity and lead to achieving goals.

In my article Arguing to Learn and to Win I described a hybrid approach between arguing to learn (ATL) and arguing to win (ATW). This article focuses on ATL and how winning can emerge from learning through a collaborative approach like the Evaporating Cloud[1] (EC), one of the six thinking processes in Eliyahu Goldratt’s Theory of Constraints.

 

Fulfilling goals

The process is a technique designed to cut through disagreements by turning attention to fulfilling all parties’ goals rather than seeking only what each person wants.

In short, EC works on the premise that conflicts can be resolved when the parties get what they need. They satisfy their goals and values.

If the overarching goal is prosperity, peace, health, freedom, and happiness, decision makers must have an accurate sense of what each term means in concrete practical terms.

 

In the world of projects, goals like prosperity are expressed in terms of cost savings, revenue, and profit. Happiness is satisfying stakeholder expectations. Health is about the goal of sustaining the wellbeing of project performers to enable effective performance over time.

With an understanding of goals, we can identify relative weights. For example, are financial goals more important than employee health and wellbeing? Are the weights negotiable?

 

In projects it is much easier to attain consensus about goals than it is in social and political disagreements. Projects are objective focused and, assuming the project is a healthy one, the objectives align with organizational goals.

When there is no consensus on goals and values, we have a zero-sum game with winners and losers. Handling those is a subject for a future article on arguing to win.

 

The Evaporating Cloud (EC)

Now, back to the Evaporating Cloud (EC) technique and finding win-win resolution.

“If you really want to remove a cloud from your life, you do not make a big production out of it, you just relax and remove it from your thinking. That’s all there is to it.[6]

 

Advertisement
[widget id=”custom_html-68″]

 

“The Evaporating Cloud tool is intended to similarly “vaporize” difficult problems by collaboratively resolving an underlying conflict. “[Goldratt teaches] that every problem is a conflict, and that conflicts arise because we create them by believing at least one erroneous assumption. Thus, simply by thinking about the assumptions that enforce the existence of a conflict, we should be able to resolve any conflict by evaporating it with the power of our thinking.[2]

Though the power of thinking has its limitations. To use a collaborative approach, at least one of the parties must step back to objectively perceive the cloud, and their place in it:

  • Emotions
  • Needs vs. Wants
  • Willingness to negotiate and collaborate to face the issues not the opponent.

 

Sharing Goals

In addition, the parties’ goals, values, and priorities must be compatible. For example, is getting elected or promoted more important than deciding on an optimal decision to serve the organization? Is your goal to have your design selected or to achieve project and organizational goals. Is one design demonstratively better than another? Is objectivity and telling the truth a shared value?

To answer these questions you must identify, understand, describe, and prioritize goals and values. What would happen if your goals weren’t met? Can you live with a negotiated compromise solution? Will the other parties agree to a solution that doesn’t give them everything they want?

 

Mutually exposing goals makes negotiation easier. Though, without open sharing it is still possible to use EC by subtly facilitating a discovery process. It is important to consider that sometimes openly sharing one’s goals may not be possible or desirable. There may be hidden agendas and motivations. Cultural norms may not support such openness. There are trust and personality issues.

 

Addressing the Wants

Knowing the goals, attention goes from Needs to Wants. Wants are about the way to achieve the goals and get what you need. For example, in projects a key goal is to satisfy stakeholders’ expectations. There are several ways to do that and there are often conflicting views on which is best.

If one way is as good as another, what does it matter which you choose? Flip a coin. Decision made. Can you and the others give up getting what you want if you get what you need? If one way is best, what makes it so? What are the criteria for deciding? Who will decide and how and when will they do it? Will they rely on emotional rhetoric, hierarchy, or analysis?

 

Benefits

A collaborative approach makes resolving conflicts a game that you can both learn from and enjoy while you find an optimal resolution and promote healthy ongoing relationships.

Relationship health is an often-overlooked benefit of collaborative decision making. “Don’t burn bridges” is good advice. Winning is great but if you are not playing the long game, you are likely to have a Pyrrhic victory. You win but at a price that is so costly that victory is tantamount to defeat.

 

For example, you or your team win an argument by undermining and alienating another team that you must work with to implement the decision or collaborate on future projects. How will that affect the organization’s goals? You may think you will never see your opponents again, but you never know if you will encounter one of them in an interview for a job you have applied for.

Less likely to be overlooked is the benefit of finding an optimal solution, whether it is a blend of elements from alternatives or choosing a demonstrably more effective outcome. Of course, there is no guarantee. But if people commit to an analytical process, collective intelligence and multiple perspectives should result in higher quality decisions.

 

Taking It Home

Assess your personal approach to conflict resolution, disagreements, and decision making? Assess your team’s and organization’s approach? Is there room for improvement?

Share this article to start a conversation as the first step in adopting a collaborative approach and adapting it to your situation.

 

[1]There are many references for EC, Wikipedia is a good place to start for further information. https://en.wikipedia.org/wiki/Evaporating_Cloud
[2] Scheinkopf, Lisa J. Thinking for a change: Putting the TOC thinking processes to use. CRC Press, 2002.

Opportunity is Everywhere for Project Managers

The world is changing fast, and so is the future of project management. For new and established project professionals, the challenge to stay competitive and relevant in our ever-evolving work environment can be daunting – particularly in the face of constant disruption and economic uncertainty.

 

The good news is project talent is still in high demand. My organization, Project Management Institute (PMI), recently released its Global Project Management Job Trends for 2023 showing that – despite the disruption and economic uncertainty – this demand will only increase, presenting a strong opportunity for project professionals to advance their careers over the next decade. In fact, from now until 2030, 2.3 million people will be needed each year to fill open project management-oriented positions, according to PMI’s most recent Talent Gap report.

 

So, what will these positions look like, and how can you take advantage of these opportunities? Here are the sectors to watch for and ways you can upskill or reskill to prepare for your next career move:

 

Construction
Despite setbacks including the global pandemic, supply chain issues, and inflation, the construction industry continues to grow and expand, creating job openings for project professionals. The recent investment in U.S. infrastructure also provides a significant opportunity, with an estimated 17 million infrastructure-related jobs to be filled by 2031, many of those in construction and built areas.

 

If you are interested in beginning or advancing your career in construction, the opportunities are endless with projects touching telecom, power, water, and more. It’s important to note that this is a rapidly evolving industry, so you must develop relevant skills, including the mastery of digital tools like building information management and cutting-edge tech to allow virtual building tours before ground has been broken.

 

If you have at least three years of project experience in the construction field, the Construction Professional in Built Environment Projects (PMI-CP)™ can help you acquire skills like stakeholder communication and scope and risk management, using construction-specific context to prime you for future opportunities in the industry.

 

Consulting & ESG
While consulting was previously more aligned with late-career professionals to leverage their professional expertise, a career in consulting is now a space for all project professionals. Project management consultants are often brought in to implement organizational transformations, requiring them to keep pace with the latest developments in new technologies like AI and low-code or no-code tools. A successful career in consulting also requires proficiency in interpersonal skills, like communication and active listening – which PMI calls “power skills” – to provide the best possible guidance to employers and clients, solve pain points, and demonstrate value aligned with organizational goals.

 

With an increasing demand for organizations to invest in environmental, social, and governance (ESG) practices, this also presents a new path for project managers to build a career in ESG. Project professionals have the necessary tools and skillset that make them well-suited to manage complex, long-term projects that require implementation, stakeholder management, and designating and meeting KPIs.

 

Financial Services
With this sector rapidly moving toward a fintech future, project professionals have an opportunity for a career in financial services to help drive this industry’s digital revolution. Gaining knowledge of data privacy, legal and regulatory requirements, and consumer expectations is crucial as financial services companies look to balance the pursuit of profit with innovation to redefine industry services.   

 

Project professionals who achieve this balance will be invaluable to their teams, helping to vet and implement trends and technology to improve customer services and advance the business, while avoiding those which do not. Because working with data privacy and regulatory factors comes with a bit of inherent risk, the PMI Risk Management Professional (PMI-RMP)® certification, for example, can help arm you with knowledge for industry success – from registering threats and risks to developing mitigation plans and customer solutions.

 

Advertisement
[widget id=”custom_html-68″]

 

PMOs: The Project Management Office
For professionals eager to help a business ensure their various projects and programs create value, consider a career in a PMO, or project management office. In the last decade, the role of the PMO has evolved. They are increasingly focused on helping organizations adapt to innovative processes as they embrace new ways of working, while also ensuring capabilities – like data and technology – are maximized in the implementation process. This requires alignment with the processes and decision-making behind a company’s big-picture objectives.

 

To pursue a role in a PMO, seeking a PMO mentor is a good first step. You might consider joining a professional association, which offers opportunities to seek out mentors specific to your desired career path. Additionally, if you have experience leading projects, obtaining a globally-recognized certification like the Project Management Professional (PMP)® certification can set you apart and prepare you to succeed and create value in a PMO.

 

Prepare for Your Next Career Move
For project professionals unsure of their preferred industry or area of focus, there are many ways to learn more about the different career paths available. Attending in-person or virtual events is one way to gain greater knowledge of trends and growth areas, with many free of charge. Events like the Virtual Experience Series 2023: PMXPO, for example, offer a chance for professionals to broaden their perspective on project management and connect with peers.

 

Additionally, membership within a professional organization like PMI® provides opportunities to network with other project professionals across industries and sectors, sharing best practices and career experiences – including tips and strategies to upskill and reskill. PMI also offers local chapter membership, which allows you to take the power of networking further with those in your own community – this can be a great way to also volunteer in chapter activities and even learn about new job openings.

 

Early-stage project professionals should consider PMI’s free, 45-minute introductory KICKOFF™ course, or its Certified Associate in Project Management (CAPM)® certification, a highly regarded certification that serves as a crucial stepping-stone on your path to career advancement. Professionals at all levels might also consider exploring PMI’s Career Navigator tool, which provides a personalized action plans to help users meet their goals.

 

Despite the uncertain economic forecast, project talent will be in demand for years to come. And fortunately for project professionals, career paths are not limited to one industry; opportunity exists across many sectors. And while the specific skillsets required of project managers somewhat varies across industries, knowledge and understanding of cutting-edge trends and technology, a mastery of power skills, a commitment to upskilling and reskilling, and connecting with a professional network are of the utmost importance. Opportunity is everywhere for project professionals; be ready when it knocks.

Practical PM for Everyone

Project management is a process that, when done well, enables optimal performance. Why wouldn’t everyone want to know how to manage projects?

 

Everyone Has Projects

A project is an effort to create a result in a finite time. According to PMI, “a project is a temporary endeavor undertaken to create a unique product, service or result. A project is temporary in that it has a defined beginning and end in time, and therefore defined scope and resources.”

Everyone is part of projects. Some projects are long, large, and complex, like a lunar expedition or the implementation of a new system in an organization. Others are moderate and more personal – planning a party, buying a car, moving, painting your house. Others are quite simple, for example getting up and out of the house, packing for a vacation, grocery shopping, doing the dishes, cooking a meal. Even the individual activities of regular operations like answering emails or working to close a sale fit the definition of projects. we can consider them as mini-projects.

 

Therefore, everyone would do well to know the basic principles of project management and adapt them to the size and complexity of the projects at hand.

Professional PMs would add value by promoting wide-spread appreciation and knowledge of project management for all.

 

Agile Adaptability

Applying a complex project management process with forms, protocols, and reports to manage your at home cooking dinner project or a small project that is repeated many times is not skillful.

You might like to be formal and explicit because it makes you feel good but if there are others involved you might drive them crazy and waste lots of time and effort.

 

At the same time, doing any project without a plan, without writing things down (for example a shopping list), with ambiguous or inadequate communication, and without looking back to learn from the experience is equally unskillful. It is likely to lead to extra trips to the store to get missing ingredients, too much or too little food, misunderstandings of who will do what, and when.

Planning, performing, monitoring, controlling, and closing happen in every project, the way we do them varies widely depending on the situation. It was the intention of the earlier founders of the agile approach to point this out and promote the idea that the project team does best to adapt practices to the needs of their project, stakeholders, and setting, while being aware of the need for a degree of structure and discipline.

 

Advertisement
[widget id=”custom_html-68″]

 

The Agile Manifesto:

“We are uncovering better ways of developing software by doing it and helping others do it.

Through this work we have come to value:

Individuals and interactions     over     processes and tools

Working software                     over     comprehensive documentation

Customer collaboration            over     contract negotiation

Responding to change              over     following a plan.

That is, while there is value in the items on the right, we value the items on the left more.”

http://agilemanifesto.org

 

Communication and Collaboration

To enable an adaptive and agile approach make sure that all stakeholders have a sense of  the basic principles of project management.

The basics are what everyone should know about managing a project, even if they are not managing one. Knowing the process and principles stakeholders can assess how well the project is being managed. They will be able to connect a sense of the project’s health  accomplishment and progress.

 

The basics are:

  1. Plan, to create a clear sense of what is to be accomplished, how, where, by when, by whom, and for how much it will cost. Remember that plans are always subject to change. Planning is not over until the project is over.
  2. Let go into execution, the performance. It’s like dance or a play. You learn the steps and your role and surrender into performing them.
  3. Mindfully monitor and control to assess progress against the plan and to adjust. Make it part of the performance so it doesn’t get in the way.
  4. Close. Take a step back to assess performance. Tie up loose ends. Learn from the experience. Turn over the results.

So simple, if there is understanding, adaptability, effective communication and collaboration.

Without these the project management process becomes a burden. With them the probability of project success goes way up.

 

What gets in the Way?

You’d think that everyone would be eager to apply the basics and to understand, adapt, communicate, and collaborate. But it is not the case.  The principle things that get in the way are:

  • Lack of process thinking – Thinking all that is needed is to put heads down and do the work instead of recognizing that objectives are met by skillfully applying effort to perform a set of definable steps or tasks.
  • Too much process thinking – over formalizing project management, creating unnecessary bureaucracy and overhead.
  • Not recognizing the value – thinking that the effort to manage the project is not worthwhile.
  • Thinking that it is too hard to engage others in the work required – believing that changing stakeholder mindsets about project management is impossible.
  • Personality traits – for example, closed-mindedness, impatience, fear of being criticized and controlled, and over confidence block attempts to implement some degree of planning and control.

 

What to Do About It

Removing the obstacles to implementing the right kind of project management (PM) requires a learning process in which PM champions convince stakeholders that PM is a practical process that adds value by upgrading performance and promoting project success.

Breaking through resistance to PM requires mindset change and changing people’s minds is no easy task.

 

It is not just about getting people to take a PM course, though an appropriate one, with a skilled facilitator, is a good place to start. It is committing to a dialog that addresses resistance to applying PM principles coupled with a commitment to the agility to adapt the principles to fit the projects being performed and the people who manage and perform them.

It takes time and patience with an understanding that much of the resistance is reasonable given experience with dysfunctional PM and rigid project management professionals who don’t adapt the process to the situation at hand.

Psychology at Work to Improve Performance

Most of what gets in the way of optimal performance is rooted in psychological or emotional issues. That is why the most valued traits for a manager are communication, emotional and social intelligence, empathy, and adaptability.

 

Psychology

Psychology is the study of the way the mind functions and influences behavior. Individual psychology influences relationships and relationships are the key to effective performance, wellness, and optimal living. It follows that attention to psychology is a pillar of performance management.

Though, in many organizations, psychology has gotten a bad name.  It falls into the mental health realm. Attention to it is often avoided unless behavior gets so severe that it undeniably gets in the way of living and performing well.

 

Take for example a steering group of peers charged with making important decisions. One member is designated as chairperson. The chairperson takes the title to heart, does a lot of good work, but attempts to silence anyone who raises issues regarding the team’s process and performance.

One team member confronts the chairperson by raising uncomfortable issues. Over time the relationship between the two deteriorated. The chairperson has left the team member out of important meetings, does not respond to emails and has ignored  a direct outreach by the team member to meet and discuss their relationship in any way the chairperson chooses – one on one, mediated, in person, virtual, etc.

The refusal to engage in a dialog effects the degree to which the group can make effective decisions because it blocks the social interaction that is critical to team performance. The rest of the team “feels” the subtle disturbance. Hearts and minds close down. The free flow of discussion is blocked. Life goes on, but it is not pleasant.

 

Avoidance

One doesn’t need a PhD in psychology to know that there is a psychological process at work in this relationship, that effects performance. Causes may be fear of competition, over-aggressive perfectionism, aversion to conflict, or over-controlling. These are all related to the participants’ mindsets.

This is just one example. Performance is effected by issues that stem from anxiety, depression, need for excessive control, excessive competitiveness, obsessive and compulsive urges, and addiction expressed as anger, withdrawal, and the kind of behavior that disturbs relationships – angry outbursts, abuse, withdrawal, unnecessary and poorly managed conflict, discrimination, gossiping, absenteeism, and more.

But there is avoidance. Handling psychological or emotional issues remains difficult. Some people believe that personal psychology is  “too personal” to be addressed in “public”.  They want to separate the personal world from their work world, as if that was possible.

 

Some are not introspective and don’t acknowledge the internal processes that lead to external behavior or, if they do, they may not think they can influence the process with self-management.

Some just don’t care how their behavior affects others, thinking and saying “This is who I am, live with it.”

 

Advertisement
[widget id=”custom_html-68″]

 

Changing the Narrative

Interest in emotional intelligence with a focus on performance has  changed the narrative  by changing the terminology – people want to be more intelligent, they do not want to be lumped into a mental health category. However, to become more emotionally intelligent one must

  • Acknowledge that behavior results from internal psychological processes, the individual’s mindset, and setting.
  • Recognize the effect on others of their speech, actions, and even their “vibe.”
  • Care.
  • Accept that mindful self-awareness enables self-management.
  • Manage emotions to optimally perform.

It becomes obvious that the person who expresses anger overtly or as passive aggressive behavior impacts the team’s performance. One who views any criticism as an attack gets in the way of performance improvement. One who is afraid of speaking up robs the group of valuable insights and information.

 

Look to the Process

Promoting process thinking is the key to being able to manage psychological issues. Process thinking recognizes that everything is caused by something – a process.

In general, a group will operate more effectively if the members acknowledge and skillfully address both the visible processes and the processes operating below the line of consciousness, as needed, to optimize performance.

 

For example, to overcome aversion to criticism, cultivate awareness of both the process improvement process and the presence of internal psychological processes that lead individuals to be overly and unskillfully critical or unable to accept and value criticism.

Participants can work together when they realize that the problem of aversion to criticism gets in the way of effective performance. It involves a conflict between the idea that constructive criticism makes a positive contribution vs. the need to protect oneself or one’s position.

 

Overcome Resistance

Cognitively knowing that behavior is the result of a process is an important starting point for cultivating the capacity to avoid unskillful behavior. However intellectually knowing that mental habits like aggression or avoidance are not effective does not immediately translate into behavioral change.

Rational thought is lost to the emotions and to unhealthy beliefs and mental habits. Psychological issues are often deep and painful. Habits are hard to change.

 

So how do we get people who are stuck in neurotic patterns like resistance to criticism, shutting down communication, and yelling, to change their behavior?

There is no simple formula. The complexities include the degree to which organizations can require people to be self-aware and overcome the resistance to psychotherapy.

With the knowledge that organizational performance is the sum of team and individual performance, effectiveness becomes the measure of how well teams functions. Organizations are motivated to create a culture in which addressing emotional and psychological issues is part of performance management.

 

At the same time the workplace is not the forum for psychotherapy. At work, addressing these issues is about changing behavior. It is up to each individual to assess the causes of the their own disruptive behavior and adapt it to benefit the health of the team.

Stop focusing on labels like depression and anxiety. Instead, focus on the symptoms and their impact on performance, where performance includes the happiness and wellbeing of the people involved.

 

Going Forward

There is a simple, though not easy, process: raise consciousness, apply it, and adjust so that it there is neither too much nor too little attention to psychology and its effect.

Cultural change is set in motion by training to acknowledge the need for self-management, process-awareness, and self-awareness and how to apply them in teams.

Regularly (not too often) dialogue about the symptoms and impact of psychological issues on performance and what to do about them. When issues arise address them in the context of what the team has learned. Over time, assess your process and adjust.

 

With the right mindset, behavior that downgrades performance automatically motivates action. That mindset needs the team to be willing and able to cut through the psychological issues that get in the way.

Depending on the culture and individuals involved, readiness for this kind of change can be quick and self-supported, or can take months or even years with expert coaching and consulting.

Goals are NOT Expectations: Change Mindsets to Avoid the Suffering of Disappointed Stakeholders

Goals are something to work toward or aspire to. Expectations are beliefs that something will occur in a certain way. Goals are not expectations. And knowing the difference can help to avoid unnecessary disappointment and conflict.

 

Last month I wrote about embracing imperfection to achieve ongoing performance improvement. The implication is that we must expect imperfection, though it is certainly not a goal. Over time imperfection (for example schedule overruns, defects, and unnecessary conflicts) is very highly probable. So, expecting it to occur is realistic. It is what risk management is all about.

We also expect to achieve our goals. That expectation may be more or less realistic, depending on the goal and the capacity of the people involved to achieve it.

 

The Problem and Symptoms

While it may be wise to have no expectations, they are a natural part of life. The expectation is not the problem. The problem is failing to remember that the expectation is a belief or desire subject to uncertainty and change.

Failing to remember is a problem because it leads to unnecessary stress in the form of anxiety, anger, blaming, and more. Symptoms are conflict, unmet objectives, and the disappointment and unease of unfulfilled expectations.

 

Case Example

Imagine this scenario. Senior stakeholders have set a goal. To accomplish it means initiating work in late March, to meet the need to use an expensive, elite contractor team, only available for three months. At the end of June, the resources are firmly committed elsewhere.

According the contractor’s detailed schedule and a guarantee, the work these resources will perform can be done in three months, with some time set aside as a buffer to account for delays related to the work itself, for example sick time, slippage, testing, etc. The contractor agreement stipulates that if work does not begin in March there will be no guarantee of completion by June. If the team has to leave without completing the work the entire project will be significantly delayed.

Project management and the steering group expect that in the two months beginning January 30th the negotiation of a contract and the receipt of permission to perform the work from a corporate controller will be completed so our elite team can begin their work on the planned March start date.

 

Advertisement
[widget id=”custom_html-68″]

 

Contract negotiations with the involvement of a legal department has commonly taken an unknowable amount of time owing to the availability of attorneys, their priorities, and the issues that come up in the negotiation. The time the controller department takes to review and sign off begins only after the contract is signed and is subject to committee schedules and the number and type of issues found.

Senior sponsors expect the PM to take care of everything and get the job done. The PM believes that the predecessor tasks will be done quickly, trusting in the attorneys and accountants to do their jobs on time.

What is the likelihood of slippage? When it happens will there be anger and blaming or acceptance and understanding? Who will pay the costs associated with the delays.

 

The Cause

Over confidently expecting goals to be met with certainty is the problem. But what is the cause?

The cause is ignoring the fact that expectations are beliefs and that there is uncertainty about them being met. People tend to ignore this reality because they are so attached to the expected outcome that they can’t bear the thought that it won’t be accomplished. we tend to like certainty, especially when it comes to accomplishing or acquiring what we want.

The root cause of suffering is ignorance which appears as attachment and aversion, according to Buddhist psychology. It seems true. We tend to cling to an impossible idea or belief until we are convinced it is impossible. For example, being certain that we will meet our schedule (“I’m sure the legal department will get back to us with time to spare”).

Ignorance is an interesting word. Many people are insulted by being informed that they are ignorant, they don’t like to admit they are ignorant of something. Others do not realize or care that they are ignorant of something, for example the demanding boss/client/sponsor/project manager who is not aware of the complexity of the work that has to be done and the risks involved, and who isn’t motivated to find out.

The good news is that since ignorance is not having knowledge or information, it is curable.

 

The Solution: Risk Management

There is a solution to the problem of over confident expectations. It is to cure ignorance by making it clear to every stakeholder that uncertainty must be accepted because uncertainty in project work is an undeniable reality. That is why risk management is part of the project management process.

The core of the solution is to change mindsets. The desired mindset is one that expects uncertainty and change.

Mindset change can occur as part of a formal training program. Or it can be in the form of content in conversations, proposals and plans that highlight where there is uncertainty, what the probability of negative and positive outcomes, and what impact they may have. Mindset change can be as simple as presenting ranges of cost and schedule expectations.

With a change in mindset, practice estimating and scheduling skills to integrate risks and buffers to assess multiple scenarios and get a practical sense of how likely it is under various conditions to achieve the goal. Then throughout project life report, reassess and adjust as needed to manage expectations.

 

Going Forward

Eliminating the pain triggered by mistaking goals for expectations is simple. Get rid of ignorance and the light goes on making everything better. Simple but not easy. changing mindsets takes intention, time, and skillful effort. It is a change management or transformation program.

The effort is easiest if there is an existing process improvement process and mindset is addressed as part of it. If that is not the case, then the effort is more difficult. If the most senior leadership is open-minded and aware of the situation, change is more likely to be successful.

If the cause is not recognized on the highest levels, then rely on subtle bottom up change in which there is firm push back and skillful communication to set rational expectations.

 

References:
Managing Expectations: A Mindful Approach to Achieving Success by George Pitagorsky
The Zen Approach to Project Management by George Pitagorsky